Our Archive

removing the soil 6

New Estate Site Excavation: Earthlift are specialists in site cuts.   Do you have any Earth Moving requirements.  From small site cuts,  full basement excavations and even soil removal.  Earthlift are your trusted reliable team. Trust the team Major builders do. With more than 100 pieces of equipment available, Earthlift can tailor a package to […]

Residential Site cut Melbourne 100

Site cuts Melbourne:  Earthlift are specialists at large house excavations on rural blocks.  Site cuts in estates are a lot of what we do, so its always nice to get out of town and stretch the legs on a large block like this one. Soil removal and access is generally easier and seeing the cut […]

Hitachi excavator doing residential excavation

Earthlift have the equipment and experience to get your residential excavation completed on time and on budget. With more than 100 pieces of plant at our disposal, Each job is assessed and the most efficient equipment used to get the job done. Site excavation is not all the same,  we have excavators from 5-20 tonne.  […]

Basement Site Cut Melbourne 16

Basement excavation Melbourne.  Earthlift have been basement excavation specialists for nearly 50 years.  Bulk earthworks completed cost and time efficiently to meet any deadline. More than 2000m3 of soil removal on this one.    

Residential Site cut Melbourne 96

Sandy Site Cut Melbourne : Site cuts in sand can be a challenge.  These before and after shots show the excellent job our operator did on this one. Compaction in sand is especially important to ensure there are no soft areas.    

Residential Site cut Melbourne 93

Site cut excavator : This photo of one of our Excavator’s performing a site cut was taken by a loyal client.  Whilst out on a walk around his estate he came across our machine. Site cut looks like it is just about done with only some soil removal left to complete. Its great to receive […]

Residential Site cut Melbourne 92

House excavation in Melbourne leafy suburb. Soil removal can be difficult in built up areas,  this job had over 200m3 removed. Some significant step downs on this job however the whole site had 4 separate levels.