Site cuts in Melbourne’s fog: As the days get shorter and begin to get colder we are starting to see the Fog roll in. This significant site cut in an outer suburb was completed in a blanket of Fog.
A lot of soil removal was done on this job due to the sloping block. The time involved in completing a site cut is generally determined by the amount of material to be moved onsite. This site cut was close to being balanced so a lot of material remained onsite, It was just moved from the cut side to the fill side of the block.